检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中水北方勘测设计研究有限责任公司
出 处:《水利水电工程设计》2013年第4期21-23,56,共3页Design of Water Resources & Hydroelectric Engineering
摘 要:大柳树水利枢纽在黄河治理开发中具有承上启下的战略地位,但由于枢纽坝址位于宁夏自治区境内,而水库淹没范围绝大部分在甘肃省,水库建成后受损与受益区辖属关系不一致,这一矛盾一直是制约这项工程立项建设的主要因素。采用多种方法进行两省区权益分配研究,并提出权益分配的初步意见。Daliushu Water Control Project has an important strategic role in development of the Yellow River.Since the dam site is situated in Ningxia Hui Autonomous Region,while most of the reservoir inundation covers Cansu Province,after the reservoir is completed,the administrative relation of damaged area and beneficial area will not be consistent;this conflict is the main factor constraining approval of the project.This text puts forward many methods for studying the benefits distribution of the two provinces,and gives some preliminary suggestions.
分 类 号:TV61[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.88.23