上保护层开采被保护层抽采钻孔施工位置的确定  被引量:1

Construction Position Determination of Protected Seam Drainage Drilling During Upper Protective Layer Mining

在线阅读下载全文

作  者:袁本庆[1,2] 孟贤正[1,2] 张永将[1,2] 曹建军[1,2] 徐遵玉[1,2] 

机构地区:[1]瓦斯灾害监控与应急技术国家重点实验室,重庆400037 [2]中煤科工集团重庆研究院有限公司瓦斯防灭火研究分院,重庆400037

出  处:《煤矿安全》2013年第11期8-11,共4页Safety in Coal Mines

基  金:中煤科工集团重庆研究院自立重点项目(2012ZDXM10)

摘  要:为了底板上向穿层钻孔施工安全和增强被保护层卸压瓦斯抽采效果,依据上保护层回采过程中被保护层具有严重突出危险时穿层钻孔施工及瓦斯抽采现状,以祁东煤矿保护层开采为例,通过矿山压力、弹性力学理论和FLAC3D数值模拟软件对上保护层回采时被保护煤层上向穿层钻孔的合理布孔位置和施工时间进行了研究。结果表明:被保护9#煤穿层钻孔在滞后保护层工作面平面距离16~26 m处施工最合理、最安全。To guarantee the drilling construction safety of floor and enhance the effect of relieved gas drainage in protected seam, based on the status of drilling eonstruction and gas drainage of that the protective layer is in serious outburst danger during the mining process of the upper protective layer, taking Qidong Mine protective layer mining as an example, by using the rock pressure and elastie mechanics theory and combined with FLAC3D numerical simulation software, the reasonable drilling hole protected seam position and construction time are studied during the upper protective mining. The results show that the most reasonable and safety position of drilling hole in coal seam of protected No. 9 coal is at the place that the delay plane distance is from the protected coal 16 to 26 m.

关 键 词:保护层开采 瓦斯抽采 穿层钻孔 滞后距离 施工位置 煤与瓦斯突出 

分 类 号:TD712.6[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象