检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京首都国际机场股份有限公司,北京100621 [2]山东东岳国际经贸合作股份有限公司,济南250011 [3]山东省冶金设计院股份有限公司,济南250101
出 处:《铁道标准设计》2013年第12期79-82,共4页Railway Standard Design
摘 要:从新建隧道与既有隧道之间的合理岩柱的留设、新建隧道的施工方法以及支护方式等方面,采用数值模拟的方法,分析邻近既有平风岭隧道的新建新平风岭隧道的稳定性控制问题,提出留设8m岩柱、采用单侧壁导坑施工方法、侧向45°超前小导管加固的一体化稳定性控制对策。The issues of stability control of the newly-buih Pingfengling Tunnel adjacent to the existing Pingfengling Tunnel were analyzed by means of numerical simulation, in terms of the rock pillar's reserving between the two tunnels, the construction method for the newly-built one, the support forms and so on. As a result, an integrative control measure of tunnel stability has been proposed, such as reserving 8 m rock pillar, using single side drift method, and using advanced small ducts to laterally strengthen in 45°direction of tunnel axis.
分 类 号:U452.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30