跋山水库坝前抛石挤淤压重的效果观测  

OBSERVATION OF THE EFFECTS OF DUMPINP RIPRAP TO SQUEEZE OFF SILT AND PLACE WEIGHTS IN FRONT OF BASHAN RESERVOIR DAM

在线阅读下载全文

作  者:张志阔[1] 刘英[1] 欧钊元[1] 

机构地区:[1]山东省水利勘测设计院,济南250013

出  处:《大坝观测与土工测试》2000年第6期30-31,共2页Dam Observation and Geotechnical Tests

摘  要:通过试验 ,跋山水库提出了替代常规水库大坝坝前先清淤后压重的施工方案——抛石挤淤压重 ,即直接进行抛石 ,把淤泥挤出压重体或挤入压重体块石之间 ,这样既节省投资 ,又缩短了工期 ,可供同类工程借鉴 ;文章对挤淤试验效果观测作了深入分析。Through experiments on construction of the Bashan Reservoir dam, a new construction method is put forward. Compared with conventional construction method, which is to clean up the bottom silt before placing weight blocks in place, the new method places weights directly by dumping riprap to squeeze off the bottom silt. This method saves both investment and construction time, and could find wide application in future projects. This paper presents an in depth analysis on the observation results of the experiment leading to this new method.

关 键 词:清淤压重 抛石挤淤压重 试验观测 

分 类 号:TV698.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象