无锡地铁1号线西漳车辆段雨水泵站设计  

Design of Stormwater Pumping Station at Xizhang Metro Depot for Wuxi Metro Line No. 1

在线阅读下载全文

作  者:戴惠[1] 冯成军[1] 蒋岚岚[1] 蔡丹新[1] 

机构地区:[1]无锡市政设计研究院有限公司,江苏无锡214072

出  处:《中国给水排水》2013年第22期87-90,共4页China Water & Wastewater

摘  要:无锡市地铁1号线西漳车辆段雨水泵站是在用地紧张、环境要求高的条件下设计建造的。泵站在满足工艺要求的前提下,充分考虑了设备的隐蔽化设计,合理利用泵站上部空间,泵站建筑设计与整体环境协调一致,从工艺设计、总体布置、设备优化、建筑设计等方面进行了探讨。Stormwater pumping station at Xizhang metro depot for Wuxi metro line No. 1 was designed and built under the conditions of land shortage and high environmental requirements. In the design, the technological requirements were met, the concealed design of equipment was taken into account, the three-dimensional space was rationally used, and the pumping station building design was co- ordinated with the overall environment. The process design, overall layout, equipment optimization, ar- chitectural design were discussed.

关 键 词:雨水泵站 设备优化 隐蔽化设计 

分 类 号:TV675[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象