检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京航空航天大学经济管理学院,北京100191
出 处:《计算机集成制造系统》2013年第10期2459-2466,共8页Computer Integrated Manufacturing Systems
基 金:国家自然科学基金资助项目(71071008;70821061)~~
摘 要:鉴于实际生产环境中有很多不确定因素,针对单机生产过程中机器可能发生故障的情况,以调度鲁棒性和最大延迟时间为目标,研究了单机鲁棒调度的多目标优化方法。提出了求解最优鲁棒调度的算法,并给出了最大延迟时间约束下调度鲁棒性的优化方法。研究了以调度鲁棒性和最大延迟时间为目标的Pareto解的求解方法。通过仿真验证了该方法的适用性和有效性。Aiming at the possible fault in single-machine production, a multi-objective optimization of robust schedu- ling method was researched with objectives of robustness and maximum lateness. The algorithm to solve the optimal robust scheduling was proposed, and the scheduling robustness optimization method was given under the maximum lateness. The solving method for Pareto solution was provided with the objective of scheduling robustness and maxi- mum lateness. The applicability and effectiveness of proposed method was verified by simulation exoeriment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.244.213