基础设施BOT项目收益问题研究  被引量:1

Research on Problems of Infrastructure BOT Project Revenue

在线阅读下载全文

作  者:胡银闪 张国兴[2] 

机构地区:[1]北方民族大学商学院,宁夏银川750021 [2]兰州大学管理学院,甘肃兰州730000

出  处:《湘潭大学自然科学学报》2013年第3期122-126,共5页Natural Science Journal of Xiangtan University

基  金:教育部人文社科基金项目(10YJC630377)

摘  要:在分析基础设施BOT项目实施中私营财团和政府在项目不同阶段的参与过程、收益获取方式的基础上得出政府与私营财团是一种经济利益对立关系,当存在信息不对称的情况下,现有BOT的实施过程无法保证各方利益均达到最大化.通过对BOT实施过程重构,私营财团与政府由原来的对立走向双方全过程合作,实现了各方经济收益最大化.Based on analyzing the process of the participation of private companies and government in dif- ferent phases of project and the way of revenue acquirement in implementing infrastructure BOT project, a conclusion can be drawn that the government and the private companies are two entities with opposite eco- nomic interests. In the case of information asymmetry, the implementation process of BOT can't ensure the maximum profits for both sides. The private companies and the government gradually eliminate the antago- nism and build up the cooperation through the reconstruction of BOT implementation process, realizing the maximum economic interests for all parties.

关 键 词:基础设施 BOT 项目收益 

分 类 号:F224[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象