检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]安徽大学计算机科学与技术学院,安徽合肥230039 [2]东北大学流程工业综合自动化国家重点实验室,辽宁沈阳110004
出 处:《控制工程》2013年第6期991-995,共5页Control Engineering of China
基 金:NSFC(61374128,61333007,61290323)
摘 要:复杂工业系统运行控制由两个层次完成,即回路控制层和运行控制层。前者完成沿生产线方向各生产单元的回路控制,而后者完成各回路控制的设定值优化,通过使被控变量跟踪其设定值来优化生产性能指标(如产品质量和能耗)。给出一种新的分析运行优化控制品质的方法,该方法在回路跟踪误差较小时可以定量描述回路跟踪误差对优化品质的影响,并证明了优化指标的恶化和回路跟踪误差的平方成正比的现象,进而获得了关于回路控制对运行优化品质影响的《平方影响度》原理。此外,也证明了生产结构对优化指标的影响。根据这一原理,提出了运行优化控制品质分析的平滑鲁棒性定义和如何定量修正回路设定值的方法,以改善实际优化效果。The operation control for complex industrial processes consists of two layerloop control layer and operational control layer. The former aims at achieving the required loop control for each production unit along production line whilst the later optimizes the setpoints to the control loops so that certain per formance indexes( such as product quality and energy cost)is optimized when the closed loop controlled variables follow their setpoints well. It presents a novel method that can be used to analyze the per formance deterioration of the optimized operational control, where the impact of tracking errors of loop control to the optimized performance is quantitatively formulated when the tracking errors are small. It has been shown that loop tracking errors would generally deteriorate the optimized performance in a quadratic way leading to the establishment of the square impact principle(SIP). Moreover, it has been shown that the production infrastructure will also "affect the deterioration of the optimized performance. Formulation on the analysis on the fiat robustness(FR) and randoraness of the optimized performance in dexes will also be made and several issues on the future studies are [~sted.
关 键 词:复杂工业系统 运行优化控制 随机分布控制 优化品质分析 平滑鲁棒性 平方影响度
分 类 号:TP27[自动化与计算机技术—检测技术与自动化装置]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112