独塔斜拉桥换索过程计算分析研究  被引量:3

Analysis on Cable Replacement for a Single Tower Cable-stayed Bridge

在线阅读下载全文

作  者:姬然[1] 郑凯锋[1] 庞竞拓[1] 

机构地区:[1]西南交通大学土木工程学院,成都610031

出  处:《广东公路交通》2013年第5期13-16,26,共5页Guangdong Highway Communications

摘  要:建立独塔斜拉桥设计方案的全桥有限元模型,综合考虑主梁内力对成桥索力进行优化;计算施工阶段拉索初拉力。分析逐一卸除各拉索工况下拉索力和应力的变化及其极值;计算各换索工况下主梁和桥塔的应力变化,分析换索过程中桥梁能否正常运营。还对各换索工况下主梁竖向位移进行了分析。A finite element model of a single tower cable-stayed bridge was established. An optimization of initial stay-cable force was conducted based on the force of steel box girder; initial stay-cable forces considered con- struction stages were also calculated in this paper. Stay-cable forces and stresses in each cable replacement con- dition were calculated. Extreme values and corresponding variation were analyzed. Stress of box girders and tow- ers were also calculated in order to determine whether limitation of traffic is necessary. At last, vertical displace- ments of box girder i~ each cable replacement condition were analyzed.

关 键 词:独塔斜拉桥 有限元分析 换索过程分析 

分 类 号:U448.27[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象