检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张立成[1,2] 李艳美[1] 吴春蓉[1] 张爽[2]
机构地区:[1]沈阳建筑大学市政与环境工程学院,辽宁沈阳110168 [2]沈阳建筑大学建筑设计研究院,辽宁沈阳110168
出 处:《工业水处理》2013年第11期67-70,共4页Industrial Water Treatment
摘 要:介绍了连续流双污泥亚硝化反硝化除磷系统的启动,主要研究了实验过程中COD、TP、NH4+-N在各个反应器中的浓度变化以及总去除效果,NO2--N、NO3--N的浓度变化规律,NO2--N在亚硝化池内的亚硝化率。COD在各反应池内都能被去除,TP主要在缺氧段被去除,NH4+-N主要在亚硝化段被去除,NO2--N、NO3--N的最大积累量分别为13.96、16.98 mg/L;当出水硝氮质量浓度达4.25 mg/L时,会破坏厌氧环境。The start-up of continuous flow double sludge nitrosation denitrification dephosphorization system is in- troduced. The removing effects of COD ,TP,and NH4-N in the process of experiments, the concentration changing rules of NO2--N and NO3--N, and the total nitrosation rate of NO2--N in the nitrosation pool have mainly been studied. COD could be removed in every reaction pool. TP is mainly removed in anoxic section. NI-L-N is mainly re- moved in the nitrosation section. The maximum cumulants of NO2--N,and NO3---N are 13.96 mg/L and 16.98 mg/L,re- soectivelv. When the concentration of nitrate in effluent is 4.25 mg/L, the anaerobic environment might be destroyed.
分 类 号:X703.1[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15