检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钟磊[1] 欧阳利平[1] 蔡红霞[1] 郭俊辉[1]
出 处:《浙江电力》2013年第11期15-18,共4页Zhejiang Electric Power
摘 要:核电机组具有单机容量大、核安全要求高,且对电网扰动敏感等特征。以大型压水堆核电机组为研究对象。建立了压水堆模型,利用时域仿真法及暂态能量函数法研究了核电接入电网的暂态稳定性,以三门核电机组接入浙江电网的枯水季节最大运行方式作了算例分析。仿真计算了电网短路故障和N-2故障类型扰动下的系统及核电机组的暂态稳定性。结果表明,三门核电机组能承受电网的一般故障且接入对电网暂态稳定的影响很小,电网具有较强的稳定性。Nuclear power units are characterized by large unit capacity, high nuclear safety requirements, sensitivity to grid disturbance and so on. In this paper, the study subject is large pressurized water reactor nuclear power plants. The model of the pressurized water reactor is established, and the transient stability of the nuclear power connected to the grid is studied using time-domain simulation method and transient energy function method. The paper analyzes maximum operating mode in dry season of Sanmen Nuclear Power Plant when connected to Zhejiang power grid. The simulation calculates the transient stability of the system and the nuclear power units suffering muhiple types of fault disturbances such as grid short-circuit fault and N-2 fault. The result shows that Sanmen Nuclear Power Plant can withstand common faults and has little influence on the transient stability of power grid. This system is strongly stable.
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31