福建前兆观测台网“九五”升级改造典型问题分析  

Analysis of typical problems in "the ninth-five year plan" upgrading and reconstruction of the precursor observation network in Fujian Province

在线阅读下载全文

作  者:陈彩虹[1] 陈懿德[1] 刘坚刚[1] 林文峰[1] 刘光能 

机构地区:[1]福建省地震局,中国福州350003

出  处:《地震地磁观测与研究》2013年第5期208-213,共6页Seismological and Geomagnetic Observation and Research

基  金:福建前兆台网"九五"系统接入改造项目

摘  要:概述福建前兆观测台网"九五"升级改造情况,列举"九五"仪器升级改造实例,结合升级改造后运行管理过程中出现的突出问题进行分析,给出常见故障的排除方法,使"几五"升级改造仪器更好的运用于前兆台网观测,提高前兆观测台网每日数据产出的连续率。The basic circumstances of the precursor observation network "the ninth-five year plan" upgrade in Fujian Province were overviewed.Instances of "the ninth five-year plan" equipment upgrading were citied.The common troubleshootings were provided bases on the analysis of the outstanding issues in the trial run during the upgrade operation and management process.The objective is to make the "the ninth five-year plan" the continuous upgrading equipment used in precursor observation network,and to improve precursor observation network daily data output rate.

关 键 词:前兆观测台网 “九五”升级改造 突出问题分析 故障排除 

分 类 号:P315.78[天文地球—地震学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象