检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:汪锋[1,2] 许家林[1,2] 谢建林[1] 郭杰凯[1,2] 刘栋林[3]
机构地区:[1]中国矿业大学煤炭资源与安全开采国家重点实验室,江苏徐州221008 [2]中国矿业大学矿业工程学院,江苏徐州221008 [3]平顶山天安煤业股份有限公司一矿,河南平顶山467011
出 处:《煤炭学报》2013年第11期1917-1922,共6页Journal of China Coal Society
基 金:国家"十二五"科技支撑计划资助项目(2012BAK04B06);国家自然科学基金资助项目(51204160);江苏高校优势学科建设工程资助项目PAPD(SZBF2011-6-B35)
摘 要:针对平顶山一矿31010工作面回采期间顶板丁戊三乘人巷严重变形的问题,通过现场实测和数值模拟研究了巷道变形的原因及保护煤柱留设的问题。结果表明:工作面回采后,上覆顶板岩层中的应力发生改变,将应力值等于1.05倍原岩应力的点构成的曲线定义为采动应力边界线。采动应力边界线由开采煤层向上覆岩层呈外扩式发展,采动应力边界线距开采边界的水平距离随着距开采煤层高度的增大而逐渐增大,但增大趋势逐渐减小。采动应力边界线内侧岩层应力出现增压区和减压区,而外侧岩层仍处于原岩应力状态,采动应力边界线是划定工作面上覆岩层是否受工作面回采影响的边界线。目前顶板巷道保护煤柱宽度是按岩层移动角进行设计的,没有体现内部岩层移动变形及应力特征,导致顶板巷道保护煤柱宽度不合理而出现破坏,为此提出了基于采动应力边界线的顶板巷道保护煤柱宽度设计方法。按照此方法设计的平顶山一矿31010工作面顶板乘人巷保护煤柱宽度应为158 m。Aiming at the problem of severe deformation of the roof roadway because of 31010 working face's mining, the numerical model and field observation were applied to study the reason of roadway' s deformation and how to de- sign protective coal pillar. The results show that after mining, the stress changes in the roof, the point, whose stress equals to 1.05 times in-situ stress, constitutes the curve which is defined as mining induced stress boundary line. The line developments from the coal seam to the roof rock. The horizontal distance width between the mining boundary and induced stress boundary line is minimum in the coal seam, and the distance gradually increases with the seam distance father. However,the increasing trend gradually decreases. There are stress distressed zone and stress increased zone between the two line in the roof strata, but the others are also in the original rock stress state. We can differentiate whether the overburden rock is affected by the mining based on the mining induced stress boundary line. Now, strata movement angle is adapted to design protective coal pillar on roof roadway, however the characteristics of strata move- ment and deformation can not be reflected. Therefore, method of designing protective coal pillar on roof roadway based on mining induced stress boundary line is put forward. According to the method, the protective coal pillar' s width is 158 m for the roof roadway of 31010 working face.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.156