锚杆抗滑桩安全预警及监测方案研究  被引量:1

Safety Early Warning and Monitoring Suggestions for Anti-slide Anchor Pile

在线阅读下载全文

作  者:张涛[1,2] 石胜伟[1,2] 门玉明[3] 谢忠胜[1,2] 

机构地区:[1]中国地质调查局地质灾害防治技术中心,成都611734 [2]中国地质科学院探矿工艺研究所,成都611734 [3]长安大学地质工程与测绘学院,西安710054

出  处:《长江科学院院报》2013年第12期28-34,共7页Journal of Changjiang River Scientific Research Institute

基  金:中国地质调查局工作项目(1212011220171);国土资源大调查项目(1212010914021)

摘  要:锚杆抗滑桩是滑(边)坡加固的重要措施之一,由于岩土体介质的特殊性,其桩身及锚杆的实际应力应变与理论计算存在较大差异,致使其破坏机理与监测预警一直是工程界关注的重点和难点。通过开展锚杆抗滑桩的物理模型试验,深入研究锚杆抗滑桩变形破坏的演化规律,采用数据分析、数学模型拟合等方法,得出了锚杆抗滑桩的安全预警判据,并对锚杆抗滑桩施工期和运营期的安全监测方案提出建议。研究表明:锚杆抗滑桩从开始变形直至最终破坏大致都要经历弹性变形、弹塑性变形、塑性变形3个阶段;锚杆抗滑桩治理滑坡时,应重点对抗滑桩的桩顶位移、桩身应力应变及锚杆锚固力进行监测;建立锚杆应力值与桩顶位移的关系,预测锚杆是否屈服,为锚杆抗滑桩的监测预警提供了具有借鉴意义的思路。Anti-slide anchor pile is an important reinforcement measure for sliding (side) slope. The failure mecha- nism and monitoring warning have been the focus and difficulty of engineering because of big difference between the measured and theoretical values of pile and anchor' s stress and strain. By physical model tests on anchor piles, the evolution of anchor pile' s deformation and failure were analyzed. Data analysis, mathematical model fitting and other methods were adopted to obtain the safety early warning criterion for anti-slide anchor pile. Suggestions for safety monitoring during anchor pile' s construction and operation were proposed. Results show that anchor piles generally go through three stages, namely elastic deformation, elasto-plastic deformation, and plastic deformation from the beginning until the final destruction. Monitoring on the pile top displacement, pile' s strain and stress, and anchor force should be emphasized. The relationship between anchor bolt stress value and pile top displacement should be obtained to predict the yielding of anchor bolt.

关 键 词:锚杆抗滑桩 模型试验 滑坡 安全预警判据 监测方案 

分 类 号:TU472[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象