检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国铁道科学研究院电子计算技术研究所,北京100081
出 处:《铁路计算机应用》2013年第9期66-69,共4页Railway Computer Application
摘 要:本文通过对城市轨道交通信号系统建设难点的分析,结合工程建设实际,从三方面对信号系统建设过程中重要的监理控制措施进行论述,分别对基于关键路径法(CPM)的进度管控措施、工程协调管控措施、贯通调试管控措施的有效性及实用性进行分析,指出城市轨道交通信号系统监理控制措施应富有科学性和创新性。The paper analyzed the construction difficulties of Signal System of Urban Traffic,combined with the actual construction,the important supervisory control measures were discussed through three aspects in the construction process of Signal System.The effectiveness of the progress control measures based on (CPM) approach,the project coordination measures and the connection commissioning management measures were analyzed and discussed respectively.The paper pointed that the supervision control measure should embrace science and innovation in the Signal System of Urban Traffic.
分 类 号:U231[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117