机构地区:[1]铁科院(北京)工程咨询有限公司,北京100081 [2]中国铁道科学研究院电子计算技术研究所,北京100081
出 处:《铁路计算机应用》2013年第9期77-81,共5页Railway Computer Application
摘 要:轨道交通综合监控系统调试工程有工期短、专业性强、调试工程量大、受相关专业影响大等特点。工程监理工作的好坏直接关系到综合监控系统建设工程的投入产出、工程质量和轨道交通的安全运营。文章主要针对目前北京地铁6号线综合监控系统调试阶段的监理难点、重点和监理措施进行了探讨。The testing project of Integrated Monitoring and Control System for Urban Transit was with the characteristics as followings that the construction period was limited,professional knowledge and skills were required,the quantities of the project were large,the project was easily affected by other relevant items,etc.The effect of the project's supervision was directly related to the input/output and the construction quality to the construction project of the System,the safety of operation to the Urban Transit.The article was mainly discussed supervision difficulties,focuses and measures for the commissioning phase of the System in Beijing Subway Line 6.
分 类 号:U231[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3