检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国煤炭地质》2013年第11期31-35,54,共6页Coal Geology of China
摘 要:2011年8月6日14时,临近黄河的韩城禹昌煤矿在11#煤层回采过程中发生底板奥灰水突水,突水通过相邻煤矿采空区,并与8月7日零时5分许冲跨桑树坪煤矿北二车场绕道封闭墙进入斜井280m大巷,很快淹没整个大巷系统造成斜井整体淹井事故。在进行了井上、下水文地质调查、物探、钻探探查和示踪剂测试、水质化验与综合分析研究的基础上,初步确定了突水点与过水通道的区域,结合矿井11#煤层顶、底板、奥灰岩峰峰二段水文地质条件特征,采取了骨料灌注沉积法和松散体注浆加固法,成功隔离了两个矿井之间的水力联系。经过单位吸水率、追排水量、水位变化、残余出水量检验,达到了预期目的,实现了隐蔽突水点及过水通道快速封堵,为矿井全面恢复生产提供了重要保障。On 14:00 August 6, 2011, the Yuchang coalmine, Hancheng near the Yellow River happened floor Ordovician limestone wa- ter bursting during the coal No. 11 winning. The water bursting passing through neighboring coalmine gob and washed away N2 pitbot- tom of the Sangshuping coalmine by pass blockade wall entered into incline 280m level main roadway about 00:05 August 7, quickly drowned the entire main roadway system causing the whole incline submerged. Based on surface and underground hydrogeological in- vestigation, geophysical prospecting, drilling and tracer detection, water quality testing and comprehensive analysis, initially identified water bursting point and water channel limits; combined with hydrogeological condition characteristics of coal No. 11 roof and floor, Or- dovician Fengfeng Formation second member, using aggregate packing deposition and loose material grouting consolidation, successful- ly isolated hydraulic connection between the two coalmines. Through unit absorption rate, drainage volume, water level variation and re- sidual water charge inspection have reached the desired effect, realized hidden water bursting point and water channel instant sealing and provided principal guarantee for coalmine to resume full production.
关 键 词:矿井突水 突水通道探查 骨料灌注 注浆加固 效果检验 桑树坪矿
分 类 号:P641.461[天文地球—地质矿产勘探] TD745[天文地球—地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3