检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邱恩喜[1,2] 白朝能[2] 曾小波[2] 胡天浩[2]
机构地区:[1]西南交通大学,成都610031 [2]中铁二院工程集团有限责任公司,成都610031
出 处:《路基工程》2013年第6期195-200,共6页Subgrade Engineering
摘 要:结古寺滑坡在玉树"4·14"地震后出现了开裂和位移,针对这种情况,进行了该滑坡的成因分析及稳定性计算。研究结果表明,在暴雨+地震工况下,该滑坡处于基本稳定状态。为确保滑坡顶部结古寺和滑坡前缘城镇安全,需对该滑坡进行加固防治。针对该滑坡的工程危害性,进行了整治方案比选,综合考虑技术、施工及经济等方面,建议采用抗滑键+桩板墙+抗滑桩+截排水防治方案。After "4. 14" Yushu Earthquake, there were cracks and displacement occurring on the body of Jiegu Temple Landslide. In relation to this situation, the genesis and the stability of the landslide were studied. The results show that in case of rainstorm plus earthquake, the landslide is in the state of basic stability. To ensure the safety of Jiegu Temple on the top of the landslide and the town in the front, reinforcement is required. Aiming at the hazard degree to the engineering of the landslide, the prevention schemes were compared and selected; hence, comprehensively considering the technology, construction and economics, it is advised to use the prevention scheme of anti-sliding key + sheet-pile wall + anti-sliding pile + cut-off drain.
分 类 号:U416.163[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117