解决漳河水库二干渠防汛泄洪难题的主要方案  

Main Programs for Solving Zhanghe River Reservoir II Canal Flood Control Spillway Difficulties

在线阅读下载全文

作  者:罗家斌[1] 方军[1] 陈湘海[1] 

机构地区:[1]湖北省漳河工程管理局二干渠管理处,湖北荆门448269

出  处:《水利建设与管理》2013年第11期59-63,共5页Water Conservancy Construction and Management

摘  要:本文通过对漳河水库二干渠汛期雨洪及灌溉期渠道高水位运行存在的防汛安全问题进行研究,探讨利用董岗节制闸配套建设泄洪闸以及三星寺、刘冲串联水库联合调度运用,达到分泄洪水、确保二干渠工程安全的方案,同时根据实测水文资料对三星寺、刘冲串联水库进行了调洪演算。The flood control safety problems in Zhanghe River Reservoir II Canal flood period storm-water and irrigation period canal high water level operation are studied in this paper. The program of achieving flood shunting and ensuring safety of II canal project by supporting construction of flood release sluice in Donggang regulation sluice as well as joint dispatching of Sanxing Temple and Liuchong Tandem Reservoir is discussed. Meanwhile,flood dispatch on Sanxing Temple and Liuchong Tandem Reservoir is calculated according to measured hydrological data.

关 键 词:漳河二干渠 安全泄洪 方案 串联水库调洪演算 

分 类 号:TV82[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象