检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华南理工大学土木与交通学院,广东广州510641
出 处:《施工技术》2013年第23期88-91,共4页Construction Technology
基 金:亚热带建筑科学国家重点实验室资助项目(2013ZC18)
摘 要:广州某电缆隧道始发井采用地下连续墙内支撑支护形式,该场地地质条件相对复杂,开挖深度超过21m。监测数据分析结果表明,底板的浇筑有利于围护结构的侧向变形减小;地下连续墙的侧向变形受2个因素影响:一是内支撑的间隔,二是基坑的开挖深度;支撑的不合理布置使得支撑的内力分布不均等。同时总结了基坑开挖过程中异常数据的分析及安全预测,以确保施工现场和周围环境的安全。The diaphragm wall with inside supporting type is used for ori Guangzhou, and the geological conditions in the site are relatively comp than 21m. The results of the monitoring data show that bottom slab deformation of retaining structure. There are two factors influencing ginal well of some cable tunnel in lex, the excavation depth is more pouring can reduce the lateral the lateral deformation for the diaphragm wall, one is the inner support interval, the other is the foundation excavation depth, unreasonable layout of the inner support makes internal force distribution unequal. At the same time, the analysis of the abnormal data in the process of excavation is summed up, and safety precautions are adopted in time to ensure that the construction site and the surrounding environment are safe.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.24.18