耦合分布式仿真中任务调度的研究与实现  被引量:4

Research and Realization of Task Scheduling in Coupling Distributed System

在线阅读下载全文

作  者:向鹏[1] 黄海于[1] 

机构地区:[1]西南交通大学信息科学与技术学院,四川成都610031

出  处:《计算机技术与发展》2013年第12期78-81,共4页Computer Technology and Development

基  金:"十一五"国家支撑计划(2009BAG12A01-A01)

摘  要:在耦合分布式仿真系统中,为解决任务对资源合理利用的问题,采用一种First-Available调度策略,即在对资源和任务有效管理的基础上,根据工况计算任务的资源请求,在资源表中选取第一个符合要求的计算节点,指定此节点运行某项工况任务。测试表明,该调度策略能够快速有效匹配任务的资源请求,有非常强的实用价值和实效性,能够有效合理地利用资源,满足了大规模多工况多任务耦合仿真计算的要求。In order to solve the problem of reasonable using of task for resources, a First-Available scheduling strategy is applied in the coupling distributed system, which is to compute the resource request in accordance with working condition based on effective manage- ment for resource and tasks, choosing the first available computer node and determining a certain task. The test shows that the scheduling strategy can fast effectively match task resource request, and has very highly practical value and effectiveness, can effectively and reasona- bly make use of resources ,meeting more large-scale condition multitasking coupling simulation requirements.

关 键 词:资源管理 任务管理 First—Available调度策略 

分 类 号:TP301[自动化与计算机技术—计算机系统结构]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象