作 者:范荣鑫[1]
机构地区:[1]中国中铁二院工程集团有限责任公司,四川成都610031
出 处:《中国西部科技》2013年第12期30-31,37,共3页Science and Technology of West China
摘 要:中国铁路电化率不足60%,随着不可再生能源的日益紧张及既有铁路运量日益不足,既有非电化电路电气化扩能改造的需求将大量涌现。既有铁路T梁桥上接触网支柱基础设计是既有铁路电气化改造的重要一环,本文针对现阶段采用的楔型锚栓有可能存在安全隐患的问题,提出采用化学植筋锚栓的方案。At present, electrification rate of Chinese railway is less than 60%. With increasing lack of non- renewable energy sources and growing shortage of existing railway traffic capacity, there will be much needs for electrification and capacity expansion reconstruction. The pillar foundation design of the overhead contact system of electrification railway on existing T Beam Bridge is an important part of the existing railway electrification reconstruction. Due to the safety risks of wedge - shaped anchor used at present, this article put forward the solution of post-installed rebar with injection mortar.
关 键 词:关键词 接触网 楔型锚栓'9化学植筋锚栓
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222