检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网电力科学研究院/南京南瑞集团公司,南京211103 [2]国网上海市电力公司电力科学研究院,上海200437
出 处:《华东电力》2013年第12期2636-2639,共4页East China Electric Power
摘 要:富春江水力发电厂3号机组调速器因运行年久,无法修改控制器程序。为满足华东电监会对一次调频功能的考核要求,在监控系统设计了3号机一次调频功能,主要介绍了监控系统实施一次调频功能的优化设计过程及试验验证内容,试验结果表明在监控系统实现一次调频能够满足考核要求。Due to the long-time service, it is impossible to modify the controller program of Unit 3 in Fuchun River Hydropower Station. In order to meet the assessment requirements for primary frequency regulation by East China Electricity Regulatory Commission, the primary frequency regulation was designed for Unit 3 in the monitoring system. This paper describes the optimal design process and testing content. Experimental results show that the primary frequency regulation achieved by monitoring system can meet the assessment requirements.
分 类 号:TM761[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145