检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:段云辉[1]
机构地区:[1]郑州大学水利与环境学院,河南郑州450002
出 处:《河南科技》2013年第12期194-195,共2页Henan Science and Technology
摘 要:运用水资源系统分析理论,对南湾水库水能,以电站最大装机容量作为目标,对南湾水库1982-2011年的径流资料进行了分析验证,采用动态规划方法,制定了优化调度原则,通过对南湾水库的水能进行计算,得出电站存在富余水量,可以提高装机容量。We use the water resources systems analysis theory to optimize the scheduling of the Nanwan reservoir. The theory is based on the maximum installed capacity of the power plant as a target. We use the simulation method of dynamic programming for a long series of runoff to calculate the hydropower of Nanwan reservoir of the year 1982 to 2011. By simulation method of dynamic programming and optimal operation principle, this paper calculates the data of Nanwan reservoir, then concludes that Nanwan reservoir hydropower station obtains the existence of surplus water and has the possibility of increasing installed capacity
分 类 号:TV72[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.20.252