检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水利水电科学研究院,北京100038 [2]广西电网公司,广西南宁530022
出 处:《水利水电技术》2013年第12期100-102,共3页Water Resources and Hydropower Engineering
摘 要:由于受水库枢纽工程的影响,使得反推计算入库流量本身存在较大误差,从而增加了水库洪水预报模型研制的难度。通过对广西多个水电厂洪水预报实践,对入库洪水预报存在误差的原因进行了分析,提出使用五点三次平滑算法对入库流量进行反推,用以指导实时预报。Due to the impact from the reservoir control project,the reservoir inflow got from the reverse calculation has a larger error,thus the difficulty from developing the flood forecasting model for reservoir is accordingly increased.Through the practices of flood forecasts of several hydropower plants in Guangxi,the causation of the error from the reservoir-inflow flood forecast is analyzed herein,and then the reverse deduction of the reservoir-inflow based on the cubical smoothing algorithm with five-point approximation is put forward,so as to guide the real-time forecast concerned.
分 类 号:TV214[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46