江苏电网500kV智能变电站建设技术综述  被引量:12

Review on 500 kV Substation Construction Technology in Jiangsu Power Grid

在线阅读下载全文

作  者:吴威[1] 宋亮亮[2] 

机构地区:[1]江苏省电力公司,江苏南京210024 [2]江苏省电力公司电力科学研究院,江苏南京211103

出  处:《江苏电机工程》2013年第6期51-54,共4页Jiangsu Electrical Engineering

摘  要:随着智能变电站技术的不断发展以及建设方案的日益复杂,智能变电站长期的运行性能对其建设模式提出了要求。文中在国网公司现有智能变电站典型建设方案的基础上,介绍了江苏电网已投运的500 kV天目湖智能变电站二次系统中的新技术应用,在满足运行可靠性的前提下,提出了进一步推广一、二次设备结合程度,提高智能变电站信息融合水平,实现二次设备功能优化。With the continuing evolve of smart substation technology, as well as the increasing complexity of construction scheme, the long-term operating performance of smart substation has proposed requirements to construction mode. This paper introduces new technical application of secondary system in the 500 kV TIAN-Muhu substation based on the State Grid's existing typical building program. On the premise to meet operational reliability, it proposes to promote a further combination of secondary equipment and to increase information fusion level of smart substation, which will achieve the secondary device function optimization.

关 键 词:智能变电站 建设技术 智能组件 

分 类 号:TM63[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象