检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈瑞[1] 杨威[1] 任欢[1] 杨晓辉[1] 阎东[2] 杜林[3]
机构地区:[1]国网河南省电力公司电力科学研究院,河南郑州450052 [2]国网河南省电力公司,河南郑州450052 [3]重庆大学,重庆400044
出 处:《河南电力》2013年第4期1-4,共4页Henan Electric Power
摘 要:针对桩基础杆塔接地引线无法断开,现有测量装置无法准确测量其接地阻抗的实际问题,提出了一种基于电流传感器的三极法测量方案,并研制出相应测量装置。现场测试数据表明,该装置与传统装置一致性良好,能较好地对桩基础杆塔接地阻抗进行测量,测量精度满足工程要求。For the practical problem that pile found ation tower grounding conductor can not be disconnected and existing measuring device can not accurately measure the grounding impedance, this paper proposes a three-electrode method measurement scheme based on current sensor, and develops a corresponding measuring device.The field test data show that the device has a good consistency with the traditional device and good measurement result for pile foundation tower grounding impedance,the measurement accuracy meet the project requirements.
分 类 号:TM862[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249