检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国建筑第四工程局有限公司厦门分公司,厦门361000
出 处:《城市建筑》2013年第20期100-100,108,共2页Urbanism and Architecture
摘 要:厦门集美万达广场项目是大型商业综合体,在东南沿海地区,地下室二层,基坑开挖范围内多流塑性淤泥质土,且工期紧。为不因局部锚杆施工影响工程进展,故在底板中预埋T型钢套管,主体结构先行往上施工,后置锚杆施工,确保竣工开业,经济效益十分明显。Wanda Plaza project in Jimei district of Xiaroen C- ity is a large commercial complex in the southeast coastal ar- eas, basement floor, multi-stream within the excavation plastic sludge soil, and has a tight schedule. In order to prevent the lo- cal anchor construction affect the progress of the project, it is embedded in the floor with T-shaped steel tube, and let the ma- in structure up to construct first, then constructs the anchor construction so as to ensure completing for the opening, and the economic benefits are obvious.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62