检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]兰州交通大学土木工程学院,甘肃兰州730070
出 处:《兰州工业学院学报》2013年第6期42-46,共5页Journal of Lanzhou Institute of Technology
基 金:国家自然科学基金(50968008)
摘 要:预拱度的控制是连续刚构桥施工控制中的重要组成部分.以某大跨径连续刚构桥施工控制具体实践为基础,以灰色系统理论GM(1,1)新陈代谢模型为理论依据,探讨了连续刚构桥施工预拱度控制中灰色系统理论的具体应用,监控实践中预测数据与现场实测数据吻合良好,实践证明该方法能够优化预拱度控制,指导连续刚构桥施工.Pre-camber control is an important part in the continuous rigid frame bridge construction control, the text of a long-span continuous rigid frame bridge construction control specific practices based metabolic model theory of gray system GM ( 1,1 ) as a theoretical basis for the specific application of gray system theory in the con- trol of continuous rigid frame bridge. Pre-camber forecast data and field measurement monitoring practice in good agreement with the practice has proved that the method is able to optimize the control of the pre-camber, guiding continuous rigid frame bridge construction.
分 类 号:U445.1[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222