检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张瑞[1,2] 陈吉祥[2] 伊岩[2] 隋鸣[2]
机构地区:[1]山东山推机械有限公司 [2]山推工程机械股份有限公司
出 处:《供热制冷》2013年第12期76-79,共4页Heating & Refrigeration
摘 要:利用车间原有暖风空调末端设备及管路,并根据车间面积及负荷进行计算和选择冷水机组、冷却塔,新增冷水机组及部分末端设备,依据车间已有的工艺及设备布局设计布置管路,对工程机械总装车间提供夏季制冷,使车间人员作业区域温度控制在一个舒适的范围,为工程机械制造高大厂房设计制冷空调提供借鉴。using existing heater air conditioning ends device and the pipeline in the workshop, calculated and selected water chillers, and cooling towers according to the area and load of the workshop and the load ,added water chillers and some terminal devices, design pipe routing based on the technological and equipment layout, to provide refrigeration and air-conditioning in summer and control the temperature of the operating area in a comfortable range. This paper provides a reference for refrigeration and air-conditioning r in tall workshop of engineering machinery.
分 类 号:TU831.3[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3