检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]天津市市政工程设计研究院,天津市300051
出 处:《城市道桥与防洪》2013年第11期5-8,14,共4页Urban Roads Bridges & Flood Control
摘 要:城市道路横断面的设计是城市道路设计的重中之重。通过东北部调线工程的设计实践,考虑规范对车道数的描述,对国内相关类似城市环线快速路车道数的统计,针对远期外环线全线快速化改造后对既有外环线改造的影响等因素,并根据交通量预测及分析的结果,多方面论证,进行横断面设计。The cross-section design of urban road is the priority among the priorities in the urban road design.According to the design practice of the northeastern line project, it is considered to standardize he description of the lane number and the statistics of the ring expressway lane numbers in the similar cities of China.Aiming at the influence of the expressway reconstruction of the whole long-term outer ring line on the reconstruction of the existing outer ring line, based on the forecast and analysis results of traffic volume, and after the demonstration of many aspects, the cross-section design is carried out.
关 键 词:外环线东北部调线 横断面设计 通行能力 服务水平 多功能车道 辅道
分 类 号:U412.33[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28