检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黑龙江科技学院资源与环境工程学院,哈尔滨150027 [2]哈尔滨学院,哈尔滨150086
出 处:《矿冶》2013年第4期5-8,共4页Mining And Metallurgy
基 金:黑龙江省教育厅科研项目(12533067);国家自然科学基金项目(51074068)
摘 要:针对深部开采矿井巷道底板塑性区范围大、底鼓严重的问题,以龙煤集团东海煤矿五采区变电硐室为研究对象,采用数值模拟软件对该巷道底板锚杆支护的效果进行分析研究,并进行了现场试验,试验巷道在开掘4个月后,顶底板移近量为100 mm,且巷道围岩已基本稳定,研究结果表明,底锚技术能有效控制岩石巷的底鼓现象。这一结果对实际工程具有一定的参考价值。In deep mining, the problems of serious floor heave and large plastic area in mining roadway exist. In order to have an indepth understanding of the engineering problems arised, the central switching room of No 5 mining area of Donghai coal in Dragon Coal Group is studied. The support effect is analyzed by methods of field ob- servation and finite element simulation. Results show that the displacement between the roof and the bottom is 100 mm in the experimental roadway, and the surrounding rock is stable as a whole. Corresponding solution shows that the bottom anchor support is effective to control floor heave. The result of this study has some reference value for the engineering practice.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195