检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:霍焕广[1] 石奇光[1] 杨燕玲[1] 金蓉[1] 翟淑伟[1]
机构地区:[1]上海电力学院能源与机械工程学院,上海200090
出 处:《动力工程学报》2014年第1期77-84,共8页Journal of Chinese Society of Power Engineering
摘 要:以某1 000MW超超临界二次再热火电机组为研究对象,定量分析了系统管道的散热损失、厂用蒸汽系统损失及工质泄漏损失对单元机组热经济性的影响.结果表明:考虑全部损失时,管道热效率为97.394%,供电标准煤耗为271.935g/(kW·h).与无管道损失时相比,机组管道热效率降低2.606%,供电标准煤耗增加4.584g/(kW·h),说明在二次再热机组热经济性评价中应该考虑管道热效率.Abstract. Taking a 1 000 MW ultra supercritical double reheat power unit as the object of study, the influ ence of following factors on the unit thermal economy was quantitatively analyzed, such as the pipeline heat loss, the auxiliary system loss and the working medium leakage loss. Results show that in considera- tion of all above factors, the piping thermal efficiency is 97. 394%, and the standard coal consumption per unit production of power supply is 271. 935 g/(kW · h), and compared with the condition that no piping loss is produced, the piping thermal efficiency is reduced by 2. 606%, while the standard coal consumption per unit production of power supply increased by 4. 584 g/(kW ·h), indicat sider the piping thermal efficiency when evaluating the thermal economy ing that it is necessary to con a double reheat power unit.
关 键 词:超超临界机组 二次再热 管道热效率 反平衡 热经济性
分 类 号:TK212[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.189.49