检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《电气传动》2013年第12期24-27,共4页Electric Drive
摘 要:在电网电压对称情况下,光伏并网逆变器在传统的双闭环控制方式下拥有良好的动态和稳态性能。在电网电压不对称情况下,不对称电压和不对称电流中存在负序分量,严重影响光伏并网逆变器输入电压及输出电流品质。根据同步旋转坐标变换和对称分量法,在瞬时功率分析的基础上,采用抑制交流侧负序电流的控制方案。考虑逆变器电流安全限值等问题,实现电网电压不对称故障下光伏并网逆变器的低电压穿越运行。在Matlab/Simulink中建立了光伏并网发电系统仿真模型,得到电网电压不对称故障下的仿真结果,验证了控制策略的有效性。Under grid voltage symmetrical case,grid-connected photovoltaic inverter has good dynamic and steadystate performance in traditional double closed-loop control mode.Under grid voltage asymmetrical case,negative sequence component existing in asymmetrical voltage and asymmetrical current seriously affects the quality of input voltage and output current of photovoltaic grid-connected inverter.According to the synchronous rotating coordinate transformation and the method of symmetrical components,a control scheme was adopted that aims to suppress negativesequence current of AC side based on the analysis of the instantaneous power.Considering problems such as inverter current safety limit,the proposed LVRT operation of grid-connected photovoltaic inverter can be effectively realized under grid voltage asymmetric fault.A simulation model of grid-connected PV systems was built in Matlab/Simulink,and the simulation results under grid voltage asymmetric fault prove the effectiveness of the control strategy.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112