检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国航空港建设第三工程总队,江苏南京211100 [2]西北农林科技大学,陕西杨凌712100
出 处:《水利与建筑工程学报》2013年第6期121-124,133,共5页Journal of Water Resources and Architectural Engineering
摘 要:根据国内外对于地下洞室围岩稳定性及衬砌结构优化设计的研究思路,运用ANSYS数值分析软件对某直墙半圆拱导流洞工程进行分析,选取典型断面建立有限元分析模型。分析开挖期的围岩应力分布情况与变形规律,优化后运行期围岩及支护的稳定性态。得出如下结论:隧洞全段采用分层开挖、喷锚支护的开挖支护方案,对衬砌结构进行优化验算后,对于Ⅲ1类围岩采用70 cm厚的C25钢筋混凝土衬砌;Ⅲ2类围岩采用90 cm厚的C25钢筋混凝土衬砌;Ⅳ类围岩采用90 cm厚的C25钢筋混凝土衬砌。According to the series researches of underground tunnel stability and lining structure optimization design, and by using the ANSYS to carry out the analysis of a hydro-junction diversion tunnel with straight wall and semi-circular arch, the finite element analysis model is established by selecting the typical tunnel section. Firstly, the stress distribu- tion situation and deformation rule of the surrounding rock in the process of excavation are analyzed, and the analysis is also made for the surrounding rock and timbering stabilization during the operation after optimization. Then, after the analysis, the conclusions are obtained as follows: the tunnel is excavated by the method of entire cross section and shotcrete-rockboh timbering, after the optimized checking about the lining structure, the Ⅲ 1 kind of surrounding rock is treated by using the C25 reinforced concrete lining with the thickness of 70 cm, the Ⅲ 2 kind of surrounding rock is treat- ed by using the C25 reinforced concrete lining with the thickness of 90 cm, and the IV kind of surrounding rock is also treated by using the C25 reinforced concrete lining with the thickness of 90 cm.
分 类 号:O319.56[理学—一般力学与力学基础]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.53