检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周奇才[1] 周杰[1] 范思遐[1] 张根雷[1]
机构地区:[1]同济大学机械与能源工程学院,上海201804
出 处:《物探与化探》2014年第1期185-188,共4页Geophysical and Geochemical Exploration
摘 要:应用基于时间域有限差分法模拟软件GPRMax2D,对高铁隧道衬砌典型的不良情况,如厚度不足、空洞和钢筋布置不合理等进行了正演模拟,得到了隧道衬砌典型不良情况的正演模拟雷达图像。结合某高铁隧道工程实际检测得到的雷达图像,对两者图像作了对比分析,总结得到了隧道衬砌不良情况雷达图像的特征规律,完善了探地雷达图像资料特征解释库,提高了识别高铁隧道衬砌典型不良情况雷达图像的可信度,为高速铁路隧道的无损检测提供了有效的依据。The high-speed railway tunnel lining always suffers from some adverse conditions, such as thickness lack, cavity, and un-reasonable reinforcement arrangement. In this paper, simulation of the typical adverse lining condition was introduced by using the sim-ulation software GPRMax2D based on finite-different time-domain method ( FDTD) , and the forward simulation radar images of the typ-ical adverse lining condition were obtained. In combination with the typical radar images from detection examples of a high-speed rail-way tunnel, a comparative analysis was made between them, the features and rules of the adverse lining condition were summarized, the ground-penetrating radar data feature library was improved, and the credibility of recognizing typical adverse conditions of high-speed railway tunnel was increased. These results provide the effective basis for the high-speed railway tunnel non-destructive testing.
关 键 词:探地雷达 高铁隧道 时域有限差分 正演模拟 隧道衬砌检测
分 类 号:P631[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30