检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡正[1] 俞晓祥[1] 郭亮[1] 邢金涛[1] 梁川[1]
出 处:《水资源与水工程学报》2013年第6期141-144,共4页Journal of Water Resources and Water Engineering
基 金:四川大学大学生创新实验计划项目(20120815)
摘 要:高坝大库上游库区内水下爆炸作用于混凝土高坝上游将产生强烈冲击波,同时将影响坝体的稳定甚至造成溃坝。本文利用极限平衡状态法,定量分析了在上游库区水下爆炸作用下坝体的受力情况,并结合重力坝实例估算出坝体抵抗破坏的极限承载力,进而利用微分法优化了坝前冲击波的受力计算方法。研究结果表明:本文提出的计算方法能够较真实地反映坝前爆炸作用于混凝土高坝的受力情况。The underwater explosion action within the upstream reservoir area of high dam will produce strong shock waves on concrete dam and affect the stability of dam , even cause the break of dam.. Using limit equilibrium method, this paper quantitatively analyzed the force situation of dam under the action of underwater explosion force. A related gravity dam example was given to estimate the ultimate bearing ca- pacity of the dam to resist damage, and then the differential stress calculation method is used to optimize the calculation method of stress in front of the dam. The result showed hat the proposed method can roughly reflect the force of explosion witch accurately effect on concrete dam in the front of dam.
分 类 号:TV542.5[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145