检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国建筑股份有限公司厦门分公司
出 处:《福建建筑》2013年第12期69-71,95,共4页Fujian Architecture & Construction
摘 要:在淤泥质土条件下进行混凝土预制方桩施工,由于土方开挖引起方桩桩位偏移甚至断桩的情况,常出现在实际工程中,如何采取有效的措施控制桩位偏移是土方开挖的重点、难点。文章通过对一些工程调查分析,结合在实际工程中采取降水、排水,及合理的开挖方式、开挖路线等一系列切实可行的措施,在控制桩位的偏移方面取得良好的效果。In the concrete prefabricated square pile construction in mucky soil, due to soil excavation, square pile location deviation and even broken pile fre- quently occur in the actual projects. How to take effective measures to control the deviation of square pile location is the key and difficult point of soil excava- tion. Based on the analysis of some engineering surveys, this thesis achieves excellent achievements in controlling deviation of square pile location by combi- ning a series of feasible measures for the actual projects, such as precipitation, drainage, a reasonable excavation way and reasonable excavation routes.
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15