中原油田φ101.6mm套管延迟注水泥技术  

Delayed Cementing Technique in Ф101.6mm Casing in Zhongyuan Oilfield

在线阅读下载全文

作  者:陈道元[1] 王时成[1] 任文亮[1] 石征峰[1] 

机构地区:[1]中原石油勘探局固井工程处,河南濮阳457331

出  处:《石油钻探技术》2000年第5期43-45,共3页Petroleum Drilling Techniques

摘  要:通过地面模拟试验和现场施工对比 ,找出了小间隙双层套管固井质量的解释方法和提高固井质量的技术措施 ,指出验套、套管回插、加焊扶正块等是提高固井一次成功率和合格率的根本保障。经过现场 1 5口井的应用 ,固井质量合格率 1 0 0 % ,优质井段达 71 .2 % ,投产投注效果良好。The methods to interpret dual casing cementing quality in small clearance and improve the cementing quality are found by comparing the surface simulation test with the field operations. It is pointed that verifying casing, casing reset and welding stabilizer block are the effective way to improve the one-time cementing success rate. The applications in 15 wells show that the qualifying rate is 100 percent, high grade section is up to 71.2 percent. The effect of putting into production and injection is very good.

关 键 词:生产套管 套管延迟注水泥 固井质量 中原油田 

分 类 号:TE256.5[石油与天然气工程—油气井工程] TE26

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象