检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中水淮河规划设计研究有限公司,安徽蚌埠233001
出 处:《南水北调与水利科技》2014年第1期110-113,130,共5页South-to-North Water Transfers and Water Science & Technology
摘 要:为了解决八里湾泵站主泵房场区潜水和承压水复杂渗流问题,采用地下连续墙围封、排水孔、水平排水管、减压井等多种渗透稳定控制措施,延长渗径,增加上游水头损失,降低下游水位。与此同时,采用三维渗流数学模型法对地基渗流场进行求解,确定了地下连续墙的深度和排水孔、排水管、减压井间距,优化了渗流控制措施方案,成功解决了泵站的设计难题。研究结果可以为平原成层地层地区泵站工程的渗流和渗控设计提供参考。In order to resolve the complex seepage problem of the unconfined and confined aquifers in the Baliwan pumping sta- tion, several seepage stability control measures, such as underground continuous wall, drainage holes, horizontal drainage pipes, and relief wells, were applied to extend the seepage path, increase upstream head loss, and decrease downstream water level. The seepage field of the ground foundation was obtained using the three-dimensional seepage mathematical model, and the depth of underground continuous wall and the spacing of drainage holes, horizontal drainage pipes, and relief wells were also determined, which can optimize the seepage control measures. Therefore, the design difficulty of pumping stations was solved. The research results can provide reference for the seepage control design of pumping stations in the layered strata area in the plains.
关 键 词:八里湾泵站 渗透稳定 承压水 地下连续墙 排水孔 减压井 中粗砂垫层
分 类 号:TV68[水利工程—水利水电工程] TV223.4
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.19.244.116