中梁一级电站混凝土面板堆石坝工程主要特点  被引量:2

Main Features of Concrete Faced Rockfill Dam of Zhongliang Ⅰ Hydropower Station

在线阅读下载全文

作  者:陈耿[1] 

机构地区:[1]中国水电顾问集团中南勘测设计研究院宜昌设计院,湖北宜昌443002

出  处:《水电与新能源》2014年第1期14-18,共5页Hydropower and New Energy

摘  要:结合工程实际,重点对如何运用周边缝的设置,采用浆砌石挡墙挡坝体,避免高趾墙的混凝土浇筑对坝体上升的影响;采用混凝土挤压边墙等先进技术,加快施工进度;对大坝基础防渗处理上采用分部位分高程设计等方面进行了详细论述,以供同类工程交流借鉴。With the combination of practical engineering, the questions about how to use peripheral joint, adopting block masonry retaining walls were mainly discussed to avoid the effect of the concrete placement of high-toe wall to the rising of dam body. Advanced techniques of concrete extrusion side wall were adopted to speed up construction progress. Dam foundation anti-seepage was designed as treating by different positions and different elevations, which provides ref- erence for similar project.

关 键 词:高趾墙 度汛 纵向河谷 防渗设计 

分 类 号:TV641.4[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象