作 者:李婧[1]
机构地区:[1]中铁第一勘察设计院集团有限公司线运处,西安710043
出 处:《铁道标准设计》2014年第2期37-42,共6页Railway Standard Design
摘 要:通过对西安铁路枢纽现状及存在主要问题的分析,结合西安铁路枢纽总图规划,按照"客内货外、客货分线、布局合理、近远结合"的原则,确定银西线引入枢纽方案为与西平铁路并行至乾县车站合场设站后客货分线引入,并重点研究了银西线客车引入西安站方案及动车引入西安北站联络线方案。This paper analyzed the current situation and main problems in Xi'an railway terminal. And then, in combination with the general layout planning of Xi'an railway terminal, according to the principle of "passenger line inside and freight line outside, separating the passenger line and freight line, rational arrangement, combining the long term with short term", the scheme of leading the Yinchuan-Xi'an Railway into the Xi'an railway terminal was eventually determined as below: first the Yinchuan-Xi'an Railway would run parallel with the Xi'an-Pingliang Railway until arriving to Qianxian Railway Station where the station and yard would be rebuilt for both the two railways; then from Qianxian Railway Station, the passenger line and the freight line of the Yinchuan-Xi'an Railway would be separated to respectively continue their own way until arriving to the terminal. Emphatically, this paper researched the scheme of leading the passenger line of the Yinchuan-Xi'an Railway into the Xi'an Railway Station, and the scheme of leading the EMU of the Yinehuan-Xi'an Railway into the connection line of Xi'an North Railway Station.
分 类 号:U212.32[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7