顾北矿软岩巷道底臌原因分析及治理技术  被引量:1

Floor Heave Cause Analysis and Control Technology for Gubei Mine Soft Rock Roadway

在线阅读下载全文

作  者:陈明昌[1] 屈施展[1] 

机构地区:[1]安徽理工大学土木建筑学院,安徽淮南232001

出  处:《煤矿安全》2014年第1期57-59,63,共4页Safety in Coal Mines

基  金:安徽省高校省级自然科学重点研究资助项目(KJ2011A099);安徽省淮南市科技专项资金资助项目(2011A07911)

摘  要:针对顾北矿11-2胶带机下山严重底鼓的问题,通过对该矿底鼓发生机理分析,围岩物理力学分析以及破坏区围岩应力分布情况分析,得出底板围岩特性、水理作用、支护结构强度是该矿底鼓破坏的主要影响因素,确立了底板锚注的底鼓控制方案。通过后期现场监测和变形参数分析可知,底鼓变形得到有效控制并取得了良好的加固效果。Aiming at serious floor heave problem of Gubei Mine 11 - 2 belt conveyor downhill, by analyzing the mechanism of floor heave of the mine, the rock mass physical mechanics analysis and stress distribution analysis of surrounding rock damage area, it con- cluded that floor characteristics of surrounding rock, hydrological effect, strength of supporting structure were the main influencing fac- tors of floor heave damage. The study determined floor heave control scheme of bolt. Through field monitoring and analysis of deforma- tion parameters, it effectively controlled deformation of floor heave, and achieved good reinforcement effect.

关 键 词:软岩巷道 底鼓变形 底鼓加固 变形监测 底板锚注 

分 类 号:TD327.3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象