大型多支线供水工程的爆管水力过渡过程分析  被引量:7

Hydraulic Transient Process Analysis of Pipe Burst in Large-scale and Multi-branch Water Supply Project

在线阅读下载全文

作  者:胡建永[1] 张健[2] 陈胜[2] 

机构地区:[1]浙江水利水电学院水利工程系,浙江杭州310018 [2]河海大学水利水电学院,江苏南京210098

出  处:《水电能源科学》2014年第1期73-76,共4页Water Resources and Power

基  金:中国博士后科学基金资助项目(20100481081);江苏省博士后科研资助计划项目(1101020C);国家自然科学基金项目(51079050)

摘  要:鉴于爆管是危及大型供水工程安全运行的严重事故工况,基于瞬变流基本理论,结合超压泄压阀的工作原理,建立了地下埋管爆管工况的水力过渡过程计算分析数学模型,并提出了供水系统中最危险的爆管位置的确定方法。实例应用结果表明,该模型能反映爆管过程中管道内压力和流量的瞬变过程,确定的爆管位置具有合理性。Pipe burst is a serious threat to safe operation of large scale water supply project. Mathematic model of hy draulic transient is established for analysis of underground pipeline burst based on the theory of fluid transients and relief valve. And the method is proposed to determine the most danger position of pipe burst. Example results show that the transient process of pressure and discharge during pipe burst can be obtained by the model, and the choice of pipe burst point is rational.

关 键 词:多支线供水工程 爆管 水力过渡过程 超压泄压阀 

分 类 号:TV134.1[水利工程—水力学及河流动力学] TV672.2

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象