检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张炜[1]
出 处:《水电能源科学》2014年第1期157-160,共4页Water Resources and Power
基 金:浙江省水利科技计划项目(RC1347)
摘 要:为了解决当前中小水利水电工程施工质量评价方法中存在的样本数量少和评价指标范围小等问题,以中小水利堤防加固工程施工质量评价为例,采用模糊集理论和方法,建立了堤防加固工程施工质量模糊评价模型和评价矩阵,通过多级层次模糊评价计算,使用隶属函数进行质量等级模糊识别,以准确的量化评价结果替代了以往靠主观和经验确定的质量评价结果,表明了模糊综合评价法可较好地应用于中小水利水电工程施工质量评价中。When construction quality of current medium and small water conservancy and hydropower engineering is evaluated, the number of evaluating samples is too small and the evaluating index ranges too small. In order to solve this problem, fuzzy theory and method is used to establish comprehensive evaluation model and evaluation matrix. Taking medium and small water conservancy dike reinforcement project construction as an example, through muhi-level hierarchy fuzzy evaluation calculation, membership function is applied to identify the fuzzy quality grade. Quantitative evaluation re sults in an accurate alternative instead of using subiective experience to determine the results o{ the quality evaluation in the past. Fuzzy comprehensive evaluation method can be better used to medium and small water conservancy and hydro power project construction quality evaluation.
关 键 词:中小水利水电工程 施工质量 评价 模糊综合评价模型
分 类 号:TV523[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.161.96