检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《工业建筑》2014年第1期102-106,143,共6页Industrial Construction
基 金:国家自然科学基金项目(50778071)
摘 要:结合二次预应力组合梁的基本原理及特点,分析二次预应力组合梁现有施工技术存在的问题,即模板安装支护、混凝土浇筑、预应力筋张拉锚固困难而复杂,施工工序增加;针对这些问题,研究开发了两种连接器专利产品,一种是双套筒预应力钢筋套管连接器,可以方便地实现一期混凝土中预应力筋套管和二期混凝土中预应力筋套管的连接;另一种是双层套筒钢筋连接器,可以方便地实现一期混凝土中纵向钢筋和二期混凝土中纵向钢筋的连接,从而有效解决二次预应力组合梁现有施工技术存在的问题,提高二次预应力组合梁的技术水平。It was introduced basic principle and characteristics of twice prestressed composite beam, and analyzed the problems of the existing construction technology of twice prestressed composite beam, namely, too many processes are involved in constructing the twice prestressed composite beam, and some of the processes such as fabricating and installing the fol'mworks, pouring concrete, tensioning and anchoring prestressed tendons are rather difficult. In order to solve these construction problems, two patent products were developed and proposed, one is double sleeve prestressed tendon casing connector which can easily realize the connection of prestressed tendon casing in first term concrete and that in second term conetete, the other is double sleeve reinforced connector which can easily realize the connection of reinforcement in first term concrete and J.hat in second term concrete. These two patent products can effectively solve the two existing problems of construction technology, improve the technical level of twice prestressed composite beams.
关 键 词:二次预应力组合梁 施工技术 双套筒预应力钢筋套管连接器 双层套筒钢筋连接器
分 类 号:TU757[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.189.13.48