副井马头门分层施工技术研究  被引量:6

Study on Layered Construction Technology of Auxiliary Shaft Ingate

在线阅读下载全文

作  者:侯进山 

机构地区:[1]山西煤炭运销集团元金煤业有限公司,山西孝义032307

出  处:《煤炭工程》2014年第1期41-43,46,共4页Coal Engineering

摘  要:介绍了马头门分层施工设计方案,从施工顺序、爆破方式、出矸等对马头门分层施工工艺进行了论述,采用了"锚网索喷一次支护+钢筋混凝土二次支护"的组合方式对马头门主体部分进行支护。结果表明,分层施工马头门,既能保证马头门施工安全和质量,又能降低施工难度,提高工效,缩短工期,是一种行之有效的施工方法。The design scheme of layered construction for ingate was introduced, the construction process was discussed through the analysis of construction sequence, blasting mode, and gangue transportation. The primary support applied the technology of shotcreting and bolting with wire mesh and the secondary support applied reinforced concrete. The results show that, layered construction is an effective construction method for ingate, with the safety and quality of ingate construction guaranteed, the construction difficulty reduced, the work efficiency improved, and construction period shortened.

关 键 词:副井 马头门 分层施工 锚网索喷 双层钢筋混凝土 

分 类 号:TD264.2[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象