检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沈中友[1]
机构地区:[1]重庆文理学院,重庆402160
出 处:《煤炭工程》2014年第1期146-148,共3页Coal Engineering
摘 要:文章将承包人的不平衡报价策略分为三类,即与变更、调价、索赔结合的不平衡报价策略。分析了不平衡报价的依据所在:施工合同和工程量清单计价规范,对承包人不平衡报价与变更、调价、索赔结合的不平衡报价进行了分析。文章对上述不平衡报价策略,从招标人角度提出了相应的应对策略。The countermeasures of the unbalanced quotation prices from the contractor could be divided into three types and they were the unbalanced quotation price combined with the modification, price adjustment and claim. The paper analyzed the bases of the unbalanced quotation price and the bases were including the construction contract and the valuation standard of the quantity bill. The paper had an analysis conducted on the unbalanced quotation price of the contractor and the unbalanced quotation price combined with the modification, price adjustment and claim. From the visual view of the tenderee, the paper provided the relevant to the above unbalanced quotation price measures
分 类 号:TU723.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90