检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华东电力设计院,上海200331 [2]中电投协鑫滨海发电筹建处,江苏盐城224500
出 处:《电力勘测设计》2013年第6期7-9,29,共4页Electric Power Survey & Design
摘 要:PHC管桩沉桩锤击数偏高、贯入困难时,往往会采取一些辅助沉桩措施;遇到沉桩问题不同,所需采取的措施也不一样。本文通过在一个项目中多种辅助沉桩措施的成功应用实例,总结归纳了管桩的主要辅助沉桩措施及工艺,供同行相互借鉴、交流,共同提高PHC管桩的设计与施工水平。According to the different geological strata, some Assist Measures and Process will be used when PHC pipe pile driving difficulty or the numbers of hammer is very high. measures taken are not the same as required. In this paper, through a variety of supplementary pile in a project measures the success of the applications, accumulated a lot of experience, summed up the main supplementary pile measures and process of pipe pile, for the colleague from each other, communication, jointly improve the level of understanding of PHC pipe pile construction o
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.4