检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团成都勘测设计研究院,成都610072
出 处:《黑龙江水利科技》2013年第11期29-32,共4页Heilongjiang Hydraulic Science and Technology
摘 要:溪洛渡水电站位于四川省雷波县和云南省永善县境内金沙江干流,为中国第二大水电工程。通过介绍溪洛渡水电站左岸主厂房在开挖过程中围岩变形状况,结合厂房围岩地质条件、监测数据及声波资料,对相互间影响关系进行分析,针对松弛、变形部位进行加固处理。Xiluodu hydropower station is located in the territory of Sichuan Province, Leibo county and the Yunnan province Yongshan County, the main stream of Jinsha River, China "s second largest hydropower project. Based on the deformation conditions of the surrounding rock in the process of excavation of the main plant on the left bank in Xiluodu hydropower station, combined with geological conditions, monitoring data and acoustic data of the powerhouse, the relationships of them were analyzed, and the flabby and deformed parts were reinforced.
分 类 号:U456.31[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117